Scientific and Technological Center

Accredited by the Federal Accreditation Service (FSA) under GOST ISO/IEC 17025-2019

Video Tour

A short overview of the laboratory and its equipment

Equipment

The laboratory is equipped with more than 100 units of instruments from leading manufacturers such as Grace, Fann, Matest, Memmert, LOIP, Thermo Scientific, GreaTest, and OFITE.

Most of the equipment has no domestic analogues. The facilities enable up to 250 full sets of cement slurry tests and up to 650 sets of drilling fluid tests per quarter.

The laboratory operates in accordance with Russian and international standards: ISO 13500, ISO 10414:2008, GOST 33213-2014, RD 39-00147001-773-2004, ISO 10426, ISO 13503, ISO 10416, ISO 9001:2015.

HYPROTEC laboratory fragment
  • > 100
    units of equipment
  • > 1000
    cement slurry
    sample tests
  • > 2500
    drilling fluid
    sample tests

Well Cementing Laboratory

Drilling Fluids Laboratory

Special Testing of Cement Slurries

  • ARCTIC CONDITIONS

    Thermocyclic resistance; thermal conductivity determination

  • ELASTIC CEMENT SYSTEMS

    Young’s modulus, Poisson’s ratio, adhesion properties, and resistance to cyclic mechanical loading

  • STEAM INJECTION & HIGH-TEMPERATURE WELLS (SAGD / HPHT)

    Thermal and thermocyclic stability

  • CUSTOMER STANDARD-BASED TESTING

    Chevron/Texaco cementing recommendations; ExxonMobil cement testing requirements; Solids Suspension — On/Off Settling Test (AMOCO); Dynamic Settling Test (AMOCO)

Laboratory by the Numbers

  • 437
    wells
  • 5 470
    tests
  • 3 747
    drilling fluid tests
    70%
  • 1 723
    cement slurry tests
    30%
  • 4 254
    samples out of spec
    78%
  • 2 988
    drilling fluid deviations
    80%
  • 343
    cement slurry deviations
    20%

Services

  • Development and support in implementing innovative technical and technological solutions to optimize and improve drilling technologies for mature fields as well as regions with complex geological and environmental conditions (UBD/MPD, HPHT/LPHT, lost-circulation control, SAGD, etc.).

  • Optimization of well construction fluids and approaches to prevent complications during drilling, completion, and wellbore cleanup/start-up.

  • Optimization and selection of chemical additives to improve the quality of cement slurries and drilling fluids.

  • Development of formulations for drilling fluids, cement slurries, and kill pills tailored to specific geological conditions.

  • Development and testing of spacer/buffer fluid formulations.

  • Incoming quality control of cement, cement slurries, drilling fluids, and spacer fluids.

  • Incoming inspection of materials for preparing cement and drilling fluids, including spacer fluids.

  • Advanced training for laboratory technicians and engineers in cement and drilling fluids.

Contacts

Tyumen Office

+7 922 318 00 00

Mon–Fri 10:00–19:00

Novy Urengoy Office

+7 912 422 10 80

Mon–Sun 08:00–20:00

  • 629305, Yamalo-Nenets Autonomous Okrug, Novy Urengoy,
    138A Taezhnaya St.